Serving Myrtle Beach & the Grand Strand(843) 558-8501

    Pallet Racks in Longs, SC

    Longs calls for a phased storage conversation because the building options range from large distribution space to older showroom and light industrial units. Approximately 22 miles from Myrtle Beach, it offers planning scenarios that should not be reduced to a single standard rack height or lane depth.

    Begin with the inventory expected at opening and a separate expansion scenario. New selective pallet rack can establish direct access while operating patterns become clearer. Pushback or pallet flow can then be evaluated for repeating inventory, provided the first layout reserves the access and footprint those systems would need.

    (843) 558-8501

    Distinguish completed space from proposed expansion

    The documented Palmetto Coast description on Water Tower Road covers 69 acres, 718,000 square feet across four buildings, and suites from 25,000 to 217,000 square feet. It also identifies a completed third building of 178,000 square feet. Confirm the specific suite and its measured dimensions rather than treating the broader development description as a rack drawing.

    A proposed 253,000 square foot building and two proposed 154,000 square foot buildings on 60 additional acres are future planning references, not operating warehouse capacity. Keep any storage concept for those proposed buildings separate from a layout for confirmed space. Inventory commitments should be tied to the actual area the business expects to occupy.

    Establish a selective first phase

    A selective layout makes individual pallets accessible while a business learns its true replenishment rhythm. Size each bay around pallet dimensions, load weight, and required handling clearance. Plan cross travel and staging early so an expanding inventory does not consume the spaces needed to move it.

    Create a position schedule showing opening inventory, expected reserve quantities, and items that may later occupy deeper lanes. Preserve a logical transition area rather than scattering potential expansion across unrelated rows. The rack should be anchored to the floor, and any later configuration should be checked against the load assumptions used for its components.

    Choose the second phase by stock behavior

    Pushback rack suits repeat pallets when last in, first out retrieval within each lane is acceptable. Pallet flow supports first in, first out movement through lanes with separate loading and picking faces. Neither system should be selected merely because an expansion phase needs more positions on paper.

    For each candidate item, compare normal pallet count with proposed lane depth. Check whether replenishment can occur without blocking the picking activity it supports. Flow lanes also require evaluation of actual pallet construction and load characteristics. Keep selective positions available for changing assortments, incomplete pallet runs, and stock with handling requirements that do not fit the deeper system.

    Keep SC 9 showroom storage low and accessible

    The documented SC 9 East setting near SC 9 and SC 57 includes older showroom and light industrial buildings from the 1970s through the 1990s with 14 foot ceilings. Those spaces need a separate design approach from larger distribution buildings. Measure usable height and door access before assuming that several pallet levels can fit.

    Compact shelving can serve hand picked parts and supplies, while limited selective rack may hold compatible pallet loads. Keep showroom circulation distinct from warehouse replenishment. A short rack run with clear access may serve the operation better than deeper lanes that consume turning space or make mixed inventory harder to retrieve.

    Rack Options for Longs Operations

    Selective Pallet Rack · Pushback Rack · Pallet Flow Rack

    Review our warehouse relocation service when planning a different building, or compare the full service area.

    Longs Warehouse Storage Questions

    How much aisle space does a forklift need in Longs, SC?

    The truck decides the aisle. Counterbalance forklifts need about 12 to 13 feet, reach trucks 8 to 10 feet, and very-narrow-aisle machines 5 to 6 feet in a Longs rack layout.

    How long does it take to get and install pallet rack in Longs, SC?

    Standard sizes often move quickly. Standard teardrop components often ship on our 48-hour quick ship program, and the schedule for your Longs delivery is confirmed on your quote.

    Do you offer installation in Longs, SC?

    Yes, from design through installation. The work at your Longs site is done by experienced installation crews we schedule and manage.

    Discuss Your Longs Rack Layout

    (843) 558-8501
    Call Now